Industrial · Brazoria County, TX
BESS Facility
This battery energy storage system (BESS) project in Brazoria County, Texas involves the development of a 110-acre site designed to support large-scale energy infrastructure. The layout includes dedicated areas for battery storage, substation, and switch yard facilities, along with access roads and internal circulation. The project required detailed grading design across a large disturbed area, balancing cut and fill volumes while maintaining positive drainage across the site. A comprehensive stormwater management system was developed, including drainage area mapping, storm pipe network design, and a detention pond to control runoff and meet environmental requirements. Civil drafting services supported the production of full plan sets, including storm plan and profiles, grading plans, and detention pond sections for construction-ready documentation.
1 / 5Our Part
Technical Drafting & Plan Production:
Site Plans
Grading Plans
Utility Plans & Profiles (Storm, Sanitary, Water)
Drainage & Detention Plan Sheets
Erosion & Sediment Control Plans
Erosion & Sediment Control Details
Construction Details
Full Civil Plan Sets
Civil 3D Engineering Modeling:
Existing Surface Modeling
Proposed Surface Modeling (Grading)
Gravity & Pressure Pipe Network Modeling
Drainage & Detention Modeling
Ready to discuss your project?
Tell us about your design, drafting, plan set production, modeling, or visualization needs, and we will respond within one business day with a scope and pricing estimate.


